Main INjector ExpeRiment v-A
December 5, 2006
| Overview | CD-2 Documentation| CD-3a Documentation|Other Documents|
Overview of Charge and Experiment
- MINERvA Overview (pdf)
- DOE CD-2 and CD-3a Scorecard (pdf)
- Review Presentations by MINERvA Project Team
- Project Overview (pdf)
- Scintillators (WBS 1.0) WLS Fibers (WBS 2.0) and Clear Fiber Cables (WBS 4.0) (pdf)
- Phototubes (WBS 6.0) PMT Housing (WBS 5.0) and Electronics and DAQ (WBS 7.0) (pdf)
- Scintillator Plane Assembly (WBS 3.0) Frames Absorbers and Stand (WBS 8.0) and Module Assembly and Veto Wall (WBS 9.0) (pdf)
Required CD-2 Documentation
- Detailed Resource Loaded Schedule
- Detailed Cost Estimate (pdf)
- System Functions and Requirements Document (Conceptual Design Report) (pdf)
- Results of and Responses to Site Preliminary Design Review
- Final Closeout Report from Director’s CD-2/3a Review (pdf)
- Response to Director’s CD-2/3a Recommendations (pdf)
- Preliminary Design Drawings (Web Page)
- Project Execution Plan (pdf)
- Start-up Test Plan (see Scorecard)
- Hazard Assessment (pdf)
- Risk Management (pdf)
- Acquisition Strategy (3.2MB pdf with signed signature page) or (323kB unsigned pdf)
- Value Management/Engineering Report (pdf)
- Funding Profile (pdf)
Required Documentation unique to CD-3a
- CD-3a Justification
- Bid Packages
- Final Design Drawings and Specifications for CD-3a components (Web Page)
Other Documents
- Integrated Safety Management Document (pdf)
- Project Management Plan (pdf)
- MINERvA Project Team (pdf)
- Technical Design Report (pdf)
- Configuration Management Document (pdf)
- Quality Assurance Plan (pdf)