Main INjector ExpeRiment v-A
August 21, 2007
| Overview | CD-3b Documentation| Other Documents|
Overview of Charge and Experiment
- MINERvA Overview (pdf)
- Review Agenda (pdf)
- Review Charge (pdf)
- DOE CD-3b Scorecard (pdf with links)
- Scorecard Addendum describing documents not needed by
MINERvA for CD-3b (pdf with links) - Review Presentations by MINERvA Project Team (links to appear the week of August 14)
- Project Overview (pdf)
- Scintillators (WBS 1.0) WLS Fibers (WBS 2.0) and Clear Fiber Cables (WBS 4.0) (pdf)
- Phototubes (WBS 6.0) PMT Housing (WBS 5.0) and Electronics and DAQ (WBS 7.0) (pdf)
- Scintillator Plane Assembly (WBS 3.0) Frames Absorbers and Stand (WBS 8.0) and Module Assembly and Veto Wall (WBS 9.0) (pdf)
Required CD-3b Documentation
- Final Design Drawings and Specifications to begin contruction (web page with links)
- Bid Packages
- Results of and Responses to Site Preliminary Design Review
- Report from DOE CD_1/2/3a Review (pdf)
- Response to DOE CD_1/2/3a Recommendations (pdf)
- Link to the Director’s CD-3b Readiness Review Web Page
- Final Closeout Report from Director’s CD-3b Readiness Review (pdf)
- Response to Director’s CD-3b Readiness Review Recommendations (pdf)
- Construction Planning Document (5/30/07 Version with signatures) (pdf)
- Project Execution Plan (2/22/07 Version with signatures) (pdf)
- Resource Loaded Schedule (note: this schedule also includes tasks funded by NSF MRI grant)
- Microsoft Project File (21MB mpp file )
- Gantt Chart (pdf)
- Critical Path (pdf)
- Costs Note: unless otherwise indicated, the costs in this table are unburdened FY06$ base costs (pdf)
- Milestones (Levels 1 through 3 Milestones shown) Milestone Gantt Chart (pdf) and Milestone Dictionary (pdf)
- Two-Page Summary (pdf)
- WBS Dictionary (1.8 MB pdf)
- Detailed Cost Estimate (pdf)
- System Functions and Requirements Document (Conceptual Design Report) (pdf)
- Risk Management (Revision 12, August 7, 2007) (pdf)
- Safety Documentation
- Acquisition Strategy (pdf with signed signature page)
- Value Management/Engineering Report (pdf)
- Funding Profile (pdf)
Other Documents
- Project Management Plan (2/22/07 Version with signatures) (pdf)
- Project Change Request Summary Table (pdf file with links)
- Technical Design Report (pdf)
- Configuration Management Document (pdf)
- Quality Assurance Plan (pdf)
- Top of page