Main INjector ExpeRiment v-A
December 13-15, 2005
| Overview | General Reference Material | CD-1/CD-2 Documentation|
Link to the Directorate Web Page for this review
- Charge to the Committee (pdf)
- Agenda (pdf – linked to talks)
- List of Prepared Breakout Talks (pdf)
- Review Committee (pdf)
- Video and Phone Connection Numbers (doc)
- Information for Visitors Bringing Laptops to Fermilab (doc)
- Final Report – Director’s Prelimianary Review of MINERvA 1/05 (doc)
- Top of page
General Reference Material
- Overview of MINERvA (pdf)
- Organization Chart (pdf)
- Response to Recommendations from January 2005 Director’s Review (pdf)
- MINERvA Cost Summary Chart (pdf)
- Draft Timeline for MINERvA Project Reviews and Documents (pdf)
- Microsoft Project-Generated Files for this review (pdf):
- Microsoft Project File of MINERvA for the Director’s Review (mpp)
- Gantt for Dec05 Director’s Review
- Critical Path for Dec05 Director’s Review
- Costs for Dec05 Director’s Review
- Milestone’s for Dec05 Director’s Review
- WBS Dictionary for Dec05 Director’s Review
- MINERvA Detector Parameters (pdf)
- MINERvA Specifications Document (odf)
- MINERvA Design Reviews (paper copies will be available to the reviewers)
- Informal Monthly reports for MINERvA Project Management:
- List of BOEs (paper copies will be available to the reviewers)
CD-1/CD-2 Documentation (paper copies
available)
- Draft Acquisition Plan
- Conceptual Design Report
- Draft Preliminary Project Execution Plan
- Project Informaiton Form (ES&H categorical exclusion)
- MINERvA Integrated Safety Management Plan (in development, will be similar to NuMI/MINOS)
- Draft Hazard Analysis Tables
- Preliminary Design TDR Status/Plans
- Draft Project Management Plan
- Draft Value Management Document
- Draft Configuration Management Document
- Draft Risk Management Document